Europe Data Center Construction Market revenue accounted for US$ 11.0 Bn in 2018 and is expected to grow at a CAGR of 7.6% during the forecast period 2019 - 2027, to account to US$ 20.1 Bn by 2027

Published On: May 2019

Available Report Formats

pdf-format excel-format pptx-format
Request Free Sample Buy Now
Europe Data Center Construction Market

The availability of low temperature coupled with favorable government regulation to boost the growth of Europe data center construction market

 

Latest market study on “Data Center Construction Market to 2027 – Europe Analysis and Forecast by Type of Construction (General Construction, Mechanical Design, Electrical Design), Tier Standard (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Vertical (BFSI, Government, Technology, Telecom, Media & Entertainment, Retail, Healthcare, and Others), and Country”, The Europe Data Center Construction Market revenue accounted for US$ 11.0 Bn in 2018 and is expected to grow at a CAGR of 7.6% during the forecast period 2019 – 2027, to account to US$ 20.1 Bn by 2027. The report includes a key understanding of the driving factors of this growth and also highlights the prominent players in the market and their developments.

 

Ireland is known as the data center capital of Europe. Some of the major factors attracting investment to Ireland are ideal climatic condition, uninterrupted power supply, excellent infrastructure network, low cost land area, and access to green/renewable energy power. All these factors contribute to Ireland’s success in attracting significant international investment. Also, Ireland target to produce 40% of its power requirement through renewable source of energy. Apart from this, other factors contributing in market growth to a large extend are its highly educated and skilled workforce and high speed low latency links to the US, UK, and EU. Ireland has attracted many major data center projects, most of them are located in Dublin. Some of the major cloud service providers have established data centers and operational bases in Ireland including Google, Amazon, Facebook and Apple. As a result, data center construction market is expected to witness a huge opportunity with its rise in the Ireland region.

 

Data center construction mainly comprises of three important aspects; electrical, mechanical, and general construction. Electrical construction among these holds largest market share in terms of revenue driven by concerns regarding the uninterrupted power supply with almost negligible chances of downtime. Large power consumption being prime targets for energy efficient design measures with money saving and less electricity use, therefore, high investment in made by companies in electrical designing. UPS, Generator, PDU, Transfer Switchgear are basic components required for electrical designing. In conjunction with the increasing amount of power requirement in data centers, it is also becoming more crucial to build a solid back-up to protect the equipment and the personnel. These critical requirements along with the various benefits that data center electrical design would serve as an opportunity for organizations to make huge investment in electrical equipment’s in data center construction and further strengthen its market.


Europe Data Canter Construction Market - Country Breakdown by Revenue, 2018


The report segments the Europe Data Center Construction Market as follows:

Europe Data Canter Construction Market – By Type of Construction

  • General Construction
  • Electrical Design
    • UPS
    • Generators
    • PDU
    • Transfer Switchgears
    • Others
  • Mechanical Design
    • HVAC
    • Other Cooling Equipment

Europe Data Canter Construction Market – By Tier Standard

  • Tier 1 & 2
  • Tier 3
  • Tier 4

Europe Data Canter Construction Market – By Industry Vertical

  • BFSI
  • Telecom Media & Entertainment
  • Technology
  • Healthcare
  • Government
  • Retail
  • Others

Europe Data Canter Construction Market – By Geography

  • Europe
    • Germany
    • UK
    • France
    • Netherlands
    • Ireland
    • Denmark
    • Belgium
    • Rest of Europe

 

 

Contact Us

Contact Person: Sameer Joshi

Phone: +1-646-491-9876

Email Id: sales@businessmarketinsights.com

 

Contact Us
Phone: +16467917070
Email Id: sales@businessmarketinsights.com