Industry
From U.S. (Toll Free) : +16467917070    |   UK : +442030260021     |    sales@businessmarketinsights.com

Europe Data Center Construction Market to 2027 - Regional Analysis and Forecasts by Type of Construction (General Construction, Mechanical Design, Electrical Design), Tier Standard (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Vertical (BFSI, Government, Technology, Telecom, Media & Entertainment, Retail, Healthcare, and Others)

Report Code :  TIPTE100000384
No. of Pages :  115
Published Month :  May 2019
Category :  Technology, Media and Telecommunications
$299 per month

Best Plan
  • All Reports in One Industry
  • All Reports Read Access
  • Subscription Duration : 12 Months
  • Monthly New Reports Added
  • $1200 Yearly Saving

The Europe Data Center Construction Market is estimated to be valued at US$ 11.0 Bn in 2018 end and is expected to touch a figure of nearly US$ 20.1 Bn by 2027 end representing a CAGR of 7.6% over the forecast period.

 

Strength of Europe economy and rising demand for cloud computing in the region are major factors primarily driving the demand for data center services in Europe. The demand is primarily full filled by the co-location service providers that holds the larger share of the market in Europe. Increasing user needs such as predictive analytics, storage requirements and fast data processing are some of the applications of data center. Data centers and cloud solutions are experiencing high demands; and also investments in these technologies are expected to increase significantly. Many big companies have either built or are planning to build their data centers in the European region owing to factors such as GDPR, climatic conditions of the region, government support as well increasing business in Europe, to provide best uptime and service delivery. Several big US based tech giants are investing to host their data centers in the European region and boost their local creditability. Furthermore, the General Data Protection Regulation (GDPR) by the EU, which will come into effect in 2018 is focused to safeguard and empower data privacy of the EU citizens as well as to redesign the data privacy approach by organizations across the region. The personal data cannot be transferred outside the European Economic Area without ensuring certain safeguards. Thus, the Europe data center construction market is poised to provide significant profitable business opportunities for the market olayers during the coming years.

 

Lucrative Europe Data Center Construction Market By Revenue


 

Europe Data Center Construction Market Insights

Surge in penetration of edge computing and distributed database across European region

Exponential growth in the data as a result of digital transformation has led to increased demand for edge computing. This rise in the edge computing has further resulted in rapid growth in the array of smaller data centers that are built closer to the population centers. As the edge computing processes, data and services in closer proximity of the end-user, its demand in a smaller emerging market are projected to grow significantly. The Tier-II and Tier-III markets have given rise to the entirely novel category of data centers (edge-data centers). It is also likely that some of tier II and Tier III markets would majorly remain secured from prominent retail & wholesale colocation service providers, facilitating the investment opportunity to the underserved market. These market dynamics are expected to substantially contribute to the Europe data center construction market during the forecast period. Subseuqnelty, providing numerous attractive business opportunities for the market players during thr forecast period.

 

Significant surge in generation of data generation and subsequently the demand for the  storage

Rising penetration of connected devices and easy access to internet coupled with decreasing cost of internet services has resulted in up surged demand for data storage worldwide. This is due to increasing demand for big data analytics and cloud-based services, such as online contents including movies, apps, videos and social media. The proportion of data center traffic generated by cloud was around 1.2 zettabytes of data, according to Cisco Systems, and this comprised of 46% of the total traffic. Furthermore, the company estimates that in the year 2017, this data center traffic will increase to 69% or 5.3 zettabytes of all data traffic. This has resulted in cloud-based companies to deploy more IT space in their data centers.

 

Europe Data Center Construction Market – Type of Construciton Insights

Europe data center construction market by type of construction is categorized into electrical design, mechanical design and general construction. Regardless of the tier level and size, the basic characteristics required to ensure smooth functioning of business is similar for each data center. The redundancy level required is one of the crucial factor which determines the cost of data center and is therefore responsible for the revenue share for each of the sub-segment. For instance, surge in redundancy increases the demand for additional back-up power supply in a way increasing the cost contribution of electrical design sub-segment for a data center. This at the same time requires additional cooling equipment on order to ensure proper functioning of electrical equipment.

Europe Data Center Construction Market – Tier Standard Insights

The Europe data center construction market by tier standards is categorized into tier 1 & 2, tier 3 and tier 4 data centers. Quality and reliability of data center server hosting ability is evaluated by data center standards. These standards are developed by Uptime Institute, LLC, an advisory organization focused on the development of IT infrastructure. The ratings begin with Tier 1 data center and ends with Tier 4 data center. Tier level increases with the cost of infrastructure and operational complexities. Selecting a suitable Tier level data center is dependent upon the enterprise as per their business needs.

 

Europe Data Center Construction Market – Industry Vertical Insights

The Europe data center construction by industry vertical is categorized into (Banking, Financial, Securities and Insurance) BFSI, Government, Technology, Telecom Media & Entertainment, Retail, Healthcare, and Others. The characterization is based on the major sectors where data center finds majority of applications. Data center are now widely used among variety of industries. Major industries are using data center technology to stay flexible as well to modernize their IT architecture to create key insights. The institutions deal with storing and processing a lot of data regularly. Data center help financial institutions by providing greater security, flexibility, compliance, and scale. Energy sector, (for example oil sands, hub sites, refineries, pumping stations and others) require data center in certain situations including; extremely harsh environmental conditions, improper infrastructure, inadequate skilled professionals, and added transportation cost and time. Thus, providing numerous profitable business opportunities for the Europe data center construction market players during the coming yearas.

 

Rest of Europe Data Center Construction Market Revenue by End-user (USD Mn)

 

 

Europe Data Center Construction Market - Strategic Insights

Market Initiatives was observed as the most adopted strategy in the Europe Data Center Construction Market. Few of the recent market initiatives adopted by some of the leading market players operating in the Europe data center construction market are listed below;

 

2018: Interxion opened its first phase of MRS2, its second data center in Marseille. Construction of MRS2 is managed by Cap Ingelec in a consortium with Cari, a subsidiary of Fayat Group.

 

2016: The company, Jacobs announced that it received a contract to provide the U.S. Army Program Executive Office Missiles & Space (PEO MS) with enterprise IT support services.

 

2015: NTT Communications Hong Kong Financial Data Center Tower 2 got an honorable mention at the awards. Arup was the MEP consultant and Project Manager for the state-of-the-art IT infrastructure and networking facility. A fully built BIM model was formulated throughout the whole building life cycle, enabling coordinated working, clash reduction, design optimization and improved efficiency.

 

 

EUROPE DATA CENTER CONSTRUCTION MARKET SEGMENTATION

Europe Data Center Construction Market – By Type of Construction

  • General Construction
  • Electrial Design
    • UPS
    • Generators
    • PDU
    • Transfer Switchegears
    • Others
  • Mechanical Design
    • HVAC
    • Other Cooling Equipment

Europe Data Center Construction Market – By Tier Standard    

  • Tier 1 & 2
  • Tier 3
  • Tier 4

 

Europe Data Center Construction Market - By Industry Vertical

  • BFSI
  • Telecom Media & Entertainment
  • Technology
  • Healthcare
  • Government
  • Retail
  • Others

 

Europe Data Center Construction Market - By Geography

  • Europe
    • Germany
    • UK
    • France
    • Netherlands
    • Ireland
    • Denmark
    • Belgium
    • Rest of Europe  

 

Europe Data Center Construction Market - Company Profiles

  • AECOM INC.
  • ARUP
  • CAP INGELEC SAS
  • ISG PLC
  • JACOBS
  • JOHN SISK & SON
  • JONES ENGINEERING GROUP
  • MACE GROUP
  • MERCURY ENGINEERING
  • SKANSKA
  • STRUCTURETONE

 

The List of Companies

  1. AECOM Inc
  2. ISG PLC
  3. Jacobs
  4. John Sisk & Son
  5. Jones Engoineering Group
  6. Mace Group
  7. Mercury Engineering
  8. Structuretone
  9. Skanska
  10. Arup
  11. Cap Ingelec
  • Save and reduce time carrying out entry-level research by identifying the growth, size, leading players and segments in the Europe data center construction market.
  • Highlights key business priorities in order to assist companies to realign their business strategies.
  • The key findings and recommendations highlight crucial progressive industry trends in the Europe data center construction market, thereby allowing players across the value chain to develop effective long term strategies.
  • Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
  • Scrutinize in-depth global market trends and outlook coupled with the factors driving the market, as well as those hindering it.
  • Enhance the decision-making process by understanding the strategies that underpin commercial interest with respect to client products, segmentation, pricing and distribution.