Europe Data Center Construction Market to 2027 - Regional Analysis and Forecasts by Type of Construction (General Construction, Mechanical Design, Electrical Design), Tier Standard (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Vertical (BFSI, Government, Technology, Telecom, Media & Entertainment, Retail, Healthcare, and Others)
The Europe Data Center Construction Market is estimated to be valued at US$ 11.0 Bn in 2018 end and is expected to touch a figure of nearly US$ 20.1 Bn by 2027 end representing a CAGR of 7.6% over the forecast period.
Strength of Europe economy and rising demand for cloud computing in the region are major factors primarily driving the demand for data center services in Europe. The demand is primarily full filled by the co-location service providers that holds the larger share of the market in Europe. Increasing user needs such as predictive analytics, storage requirements and fast data processing are some of the applications of data center. Data centers and cloud solutions are experiencing high demands; and also investments in these technologies are expected to increase significantly. Many big companies have either built or are planning to build their data centers in the European region owing to factors such as GDPR, climatic conditions of the region, government support as well increasing business in Europe, to provide best uptime and service delivery. Several big US based tech giants are investing to host their data centers in the European region and boost their local creditability. Furthermore, the General Data Protection Regulation (GDPR) by the EU, which will come into effect in 2018 is focused to safeguard and empower data privacy of the EU citizens as well as to redesign the data privacy approach by organizations across the region. The personal data cannot be transferred outside the European Economic Area without ensuring certain safeguards. Thus, the Europe data center construction market is poised to provide significant profitable business opportunities for the market olayers during the coming years.
Get more information on this report : Lucrative Europe Data Center Construction Market By Revenue
Europe Data Center Construction Market Insights
Surge in penetration of edge computing and distributed database across European region
Exponential growth in the data as a result of digital transformation has led to increased demand for edge computing. This rise in the edge computing has further resulted in rapid growth in the array of smaller data centers that are built closer to the population centers. As the edge computing processes, data and services in closer proximity of the end-user, its demand in a smaller emerging market are projected to grow significantly. The Tier-II and Tier-III markets have given rise to the entirely novel category of data centers (edge-data centers). It is also likely that some of tier II and Tier III markets would majorly remain secured from prominent retail & wholesale colocation service providers, facilitating the investment opportunity to the underserved market. These market dynamics are expected to substantially contribute to the Europe data center construction market during the forecast period. Subseuqnelty, providing numerous attractive business opportunities for the market players during thr forecast period.
Significant surge in generation of data generation and subsequently the demand for the storage
Rising penetration of connected devices and easy access to internet coupled with decreasing cost of internet services has resulted in up surged demand for data storage worldwide. This is due to increasing demand for big data analytics and cloud-based services, such as online contents including movies, apps, videos and social media. The proportion of data center traffic generated by cloud was around 1.2 zettabytes of data, according to Cisco Systems, and this comprised of 46% of the total traffic. Furthermore, the company estimates that in the year 2017, this data center traffic will increase to 69% or 5.3 zettabytes of all data traffic. This has resulted in cloud-based companies to deploy more IT space in their data centers.
Europe Data Center Construction Market – Type of Construciton Insights
Europe data center construction market by type of construction is categorized into electrical design, mechanical design and general construction. Regardless of the tier level and size, the basic characteristics required to ensure smooth functioning of business is similar for each data center. The redundancy level required is one of the crucial factor which determines the cost of data center and is therefore responsible for the revenue share for each of the sub-segment. For instance, surge in redundancy increases the demand for additional back-up power supply in a way increasing the cost contribution of electrical design sub-segment for a data center. This at the same time requires additional cooling equipment on order to ensure proper functioning of electrical equipment.
Europe Data Center Construction Market – Tier Standard Insights
The Europe data center construction market by tier standards is categorized into tier 1 & 2, tier 3 and tier 4 data centers. Quality and reliability of data center server hosting ability is evaluated by data center standards. These standards are developed by Uptime Institute, LLC, an advisory organization focused on the development of IT infrastructure. The ratings begin with Tier 1 data center and ends with Tier 4 data center. Tier level increases with the cost of infrastructure and operational complexities. Selecting a suitable Tier level data center is dependent upon the enterprise as per their business needs.
Europe Data Center Construction Market – Industry Vertical Insights
The Europe data center construction by industry vertical is categorized into (Banking, Financial, Securities and Insurance) BFSI, Government, Technology, Telecom Media & Entertainment, Retail, Healthcare, and Others. The characterization is based on the major sectors where data center finds majority of applications. Data center are now widely used among variety of industries. Major industries are using data center technology to stay flexible as well to modernize their IT architecture to create key insights. The institutions deal with storing and processing a lot of data regularly. Data center help financial institutions by providing greater security, flexibility, compliance, and scale. Energy sector, (for example oil sands, hub sites, refineries, pumping stations and others) require data center in certain situations including; extremely harsh environmental conditions, improper infrastructure, inadequate skilled professionals, and added transportation cost and time. Thus, providing numerous profitable business opportunities for the Europe data center construction market players during the coming yearas.
Rest of Europe Data Center Construction Market Revenue by End-user (USD Mn)
Europe Data Center Construction Market - Strategic Insights
Market Initiatives was observed as the most adopted strategy in the Europe Data Center Construction Market. Few of the recent market initiatives adopted by some of the leading market players operating in the Europe data center construction market are listed below;
2018: Interxion opened its first phase of MRS2, its second data center in Marseille. Construction of MRS2 is managed by Cap Ingelec in a consortium with Cari, a subsidiary of Fayat Group.
2016: The company, Jacobs announced that it received a contract to provide the U.S. Army Program Executive Office Missiles & Space (PEO MS) with enterprise IT support services.
2015: NTT Communications Hong Kong Financial Data Center Tower 2 got an honorable mention at the awards. Arup was the MEP consultant and Project Manager for the state-of-the-art IT infrastructure and networking facility. A fully built BIM model was formulated throughout the whole building life cycle, enabling coordinated working, clash reduction, design optimization and improved efficiency.
EUROPE DATA CENTER CONSTRUCTION MARKET SEGMENTATION
Europe Data Center Construction Market – By Type of Construction
- General Construction
- Electrial Design
- UPS
- Generators
- PDU
- Transfer Switchegears
- Others
- Mechanical Design
- HVAC
- Other Cooling Equipment
Europe Data Center Construction Market – By Tier Standard
- Tier 1 & 2
- Tier 3
- Tier 4
Europe Data Center Construction Market - By Industry Vertical
- BFSI
- Telecom Media & Entertainment
- Technology
- Healthcare
- Government
- Retail
- Others
Europe Data Center Construction Market - By Geography
- Europe
- Germany
- UK
- France
- Netherlands
- Ireland
- Denmark
- Belgium
- Rest of Europe
Europe Data Center Construction Market - Company Profiles
- AECOM INC.
- ARUP
- CAP INGELEC SAS
- ISG PLC
- JACOBS
- JOHN SISK & SON
- JONES ENGINEERING GROUP
- MACE GROUP
- MERCURY ENGINEERING
- SKANSKA
- STRUCTURETONE
PART 1. iNTRODUCTION
1.1 Scope of the Study
1.2 The Insight partners research report guidance
1.3 market segmentation
1.3.1 Europe Data Center Construction Market – By Type of Construction
1.3.2 Europe Data Center Construction Market – By Tier Standards
1.3.3 Europe Data Center Construction Market – By Industry Verticals
1.3.4 Europe Data Center Construction Market – By Country
PART 2. Europe Data Center Construction market - key takeaways
PART 3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
PART 4. Europe Data Center Construction market landscape
4.1 market overview
4.2 Europe PEST Analysis
PART 5. Europe Data Center Construction market – key industry dynamics
5.1 key market drivers
5.1.1 Emergence of distributed IT and edge computing saw an increase in the number of data center being used
5.1.2 Rapidly increasing data traffic
5.1.3 High EBITDA margins in the infrastructure sector
5.1.4 Development in analytical capabilities for effective decision making
5.2 Key market restraints
5.2.1 High CaPex, OpEx & TCO for building Data Center
5.2.2 Complex infrastructure
5.2.3 Emergence of containerized data center
5.3 key market opportunities
5.3.1 Growth in adoption of hyper scale data center to generate opportunity for the market
5.3.2 Growth in Green Data Center
5.3.3 Constant growth in number of data center construction
5.4 Future trends
5.4.1 Colocation and cloud services are expected to gain the larger pie of the market
5.4.2 Technological complexity and need for security will drive the growth in near future
5.5 impact analysis of Drivers and restraints
PART 6. Data Center Construction –Europe market analysis
6.1 Europe Data Center Construction Market Overview
6.2 Europe Data Center Construction market Forecast and Analysis
PART 7. Europe Data Center Construction Market Analysis – By TYPES OF CONSTRUCTION
7.1 Overview
7.2 Europe Data Center Construction Market Breakdown, By TYPES OF CONSTRUCTION, 2018 & 2027
7.3 GENERAL CONSTRUCTION
7.3.1 Overview
7.3.2 Europe Data Center Construction Market, By General Construction Revenue and Forecasts to 2027 (US$ Mn)
7.4 ELECTRICAL DESIGN
7.4.1 Overview
7.4.2 Europe Data Center Construction Market, By Light Sensor Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.3 UPS
7.4.3.1 Overview
7.4.3.2 Europe Data Center Construction Market, By UPS Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.4 Generators
7.4.4.1 Overview
7.4.4.2 Europe Data Center Construction Market, By Generators Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.5 PDU
7.4.5.1 Overview
7.4.5.2 Europe Data Center Construction Market, By PDU Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.6 Transfer Switchgear
7.4.6.1 Overview
7.4.6.2 Europe Data Center Construction Market, By Transfer Switchgear Market Revenue and Forecasts to 2027
(US$ Mn)
7.4.7 Others
7.4.7.1 Overview
7.4.7.2 Europe Data Center Construction Market, By Others Market Revenue and Forecasts to 2027 (US$ Mn)
7.5 Mechanical Design
7.5.1 Overview
7.5.2 Europe Data Center Construction Market, By Mechanical Design Market Revenue and Forecasts to 2027 (US$ Mn)
7.5.3 HVAC
7.5.3.1 Overview
7.5.3.2 Europe Data Center Construction Market, By HVAC Market Revenue and Forecasts to 2027 (US$ Mn)
7.5.4 Other Cooling Equipment
7.5.4.1 Overview
7.5.4.2 Europe Data Center Construction Market, By Other Cooling Equipment Market Revenue and Forecasts to 2027 (US$ Mn)
PART 8. Europe Data Center Construction Market Analysis – By TIER STANDARDS
8.1 Overview
8.2 Europe Data Center Construction Market Breakdown, By TIER STANDARDS, 2018 & 2027
8.3 Tier 1 & 2
8.3.1 Overview
8.3.2 Europe Data Center Construction Market, By Tier 1 & Tier 2 and Forecasts to 2027 (US$ Mn)
8.4 TIER 3
8.4.1 Overview
8.4.2 Europe Data Center Construction Market, By TIER 3 Market Revenue and Forecasts to 2027 (US$ Mn)
8.5 TIER 4
8.5.1 Overview
8.5.2 Europe Data Center Construction Market, By TIER 4 Market Revenue and Forecasts to 2027 (US$ Mn)
PART 9. Europe Data Center Construction Market Analysis – By INDUSTRY VERTICAL
9.1 Overview
9.2 Europe Data Center Construction Market Breakdown, By INDUSTRY VERTICAL, 2018 & 2027
9.3 BFSI
9.3.1 Overview
9.3.2 Europe Data Center Construction Market, By BFSI Market Revenue and Forecasts to 2027 (US$ Mn)
9.4 Government
9.4.1 Overview
9.4.2 Europe Data Center Construction Market, By Government Market Revenue and Forecasts to 2027 (US$ Mn)
9.5 Technology
9.5.1 Overview
9.5.2 Europe Data Center Construction Market, By Technology Market Revenue and Forecasts to 2027 (US$ Mn)
9.6 TELECOM MEDIA & ENTERTAINMENT
9.6.1 Overview
9.6.2 Europe Data Center Construction Market, By Telecom, Media & Entertainment Market Revenue and Forecasts to 2027 (US$ Mn)
9.7 Retail
9.7.1 Overview
9.7.2 Europe Data Center Construction Market, By Retail Market Revenue and Forecasts to 2027 (US$ Mn)
9.8 healthcare
9.8.1 Overview
9.8.2 Europe Data Center Construction Market, By Healthcare Market Revenue and Forecasts to 2027 (US$ Mn)
9.9 others
9.9.1 Overview
9.9.2 Europe Data Center Construction Market, By Others Application Market Revenue and Forecasts to 2027 (US$ Mn)
PART 10. Europe Data Center Construction market – country Analysis
10.1 Overview
10.1.1 Europe Data Center Construction Market Breakdown, by Key Countries
10.1.1.1 France Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.1.1 France Data Center Construction Market Breakdown by Type Of Construction
10.1.1.1.1.1 France Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.1.1.2 France Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.1.2 France Data Center Construction Market Breakdown by Tier Standards
10.1.1.1.3 France Data Center Construction Market Breakdown by Industry Verticals
10.1.1.2 UK Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.2.1 UK Data Center Construction Market Breakdown by Type Of Construction
10.1.1.2.1.1 UK Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.2.1.2 UK Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.2.2 UK Data Center Construction Market Breakdown by Tier Standards
10.1.1.2.3 UK Data Center Construction Market Breakdown by Industry Verticals
10.1.1.3 Germany Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.3.1 Germany Data Center Construction Market Breakdown by Type Of Construction
10.1.1.3.1.1 Germany Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.3.1.2 Germany Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.3.2 Germany Data Center Construction Market Breakdown by Tier Standards
10.1.1.3.3 Germany Data Center Construction Market Breakdown by Industry Verticals
10.1.1.4 Netherlands Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.4.1 Netherlands Data Center Construction Market Breakdown by Type Of Construction
10.1.1.4.1.1 Netherlands Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.4.1.2 Netherlands Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.4.2 Netherlands Data Center Construction Market Breakdown by Tier Standards
10.1.1.4.3 Netherlands Data Center Construction Market Breakdown by Industry Verticals
10.1.1.5 Ireland Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.5.1 Ireland Data Center Construction Market Breakdown by Type Of Construction
10.1.1.5.1.1 Ireland Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.5.1.2 Ireland Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.5.2 Ireland Data Center Construction Market Breakdown by Tier Standards
10.1.1.5.3 Ireland Data Center Construction Market Breakdown by Industry Verticals
10.1.1.6 Denmark Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.6.1 Denmark Data Center Construction Market Breakdown by Type Of Construction
10.1.1.6.1.1 Denmark Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.6.1.2 Denmark Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.6.2 Denmark Data Center Construction Market Breakdown by Tier Standards
10.1.1.6.3 Denmark Data Center Construction Market Breakdown by Industry Verticals
10.1.1.7 Belgium Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.7.1 Belgium Data Center Construction Market Breakdown by Type Of Construction
10.1.1.7.1.1 Belgium Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.7.1.2 Belgium Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.7.2 Belgium Data Center Construction Market Breakdown by Tier Standards
10.1.1.7.3 Belgium Data Center Construction Market Breakdown by Industry Verticals
10.1.1.8 Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.8.1 Rest of Europe Data Center Construction Market Breakdown by Type Of Construction
10.1.1.8.1.1 Rest of Europe Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.8.1.2 Rest of Europe Data Center Construction Market Breakdown by Mechanical
Design Type
10.1.1.8.2 Rest of Europe Data Center Construction Market Breakdown by Tier Standards
10.1.1.8.3 Rest of Europe Data Center Construction Market Breakdown by Industry Verticals
PART 11. Industry Landscape
11.1 Overview
11.2 Market Initiative
PART 12. Europe DATA CENTER CONSTRUCTION MARKET - key company profiles
12.1 AECOM Inc.
12.1.1 Key Facts
12.1.2 Business Description
12.1.3 Financial Overview
12.1.4 SWOT Analysis
12.1.5 Key Developments
12.2 Arup
12.2.1 Key Facts
12.2.2 Business Description
12.2.3 Financial Overview
12.2.4 SWOT Analysis
12.2.5 Key Developments
12.3 CAP Ingelec SAs
12.3.1 Key Facts
12.3.2 Business Description
12.3.3 Financial Overview
12.3.4 SWOT Analysis
12.3.5 Key Developments
12.4 ISG PLC
12.4.1 Key Facts
12.4.2 Business Description
12.4.3 Financial Overview
12.4.4 SWOT Analysis
12.4.5 Key Developments
12.5 Jacobs
12.5.1 Key Facts
12.5.2 Business Description
12.5.3 Financial Overview
12.5.4 SWOT Analysis
12.5.5 Key Developments
12.6 John Sisk & Son
12.6.1 Key Facts
12.6.2 Business Description
12.6.3 Financial Overview
12.6.4 SWOT Analysis
12.6.5 Key Developments
12.7 Jones Engineering Group
12.7.1 Key Facts
12.7.2 Business Description
12.7.3 Financial Overview
12.7.4 SWOT Analysis
12.7.5 Key Developments
12.8 Mace Group
12.8.1 Key Facts
12.8.2 Business Description
12.8.3 Financial Overview
12.8.4 SWOT Analysis
12.8.5 Key Developments
12.9 Mercury Engineering
12.9.1 Key Facts
12.9.2 Business Description
12.9.3 Financial Overview
12.9.4 SWOT Analysis
12.9.5 Key Developments
12.10 Skanska
12.10.1 Key Facts
12.10.2 Business Description
12.10.3 Financial Overview
12.10.4 SWOT Analysis
12.10.5 Key Developments
12.11 Structuretone
12.11.1 Key Facts
12.11.2 Business Description
12.11.3 Financial Overview
12.11.4 SWOT Analysis
12.11.5 Key Developments
PART 13. Appendix
13.1 about the insight partners
13.2 glossary
list of tables
TABLE 1. Europe Data Center Construction Market Revenue and Forecasts to 2027 (US$ Mn)
TABLE 2. EUROPE Data Center Construction Market Revenue and Forecasts to 2027 – By Type (US$ Mn)
TABLE 3. EUROPE Data Center Construction Market Revenue and Forecasts to 2027 – By TIER STANDARDS (US$ Mn)
TABLE 4. EUROPE Data Center Construction Market Revenue and Forecasts to 2027 – By INDUSTRY VERTICAL (US$ Mn)
TABLE 5. EUROPE Data Center Construction Market Revenue and Forecasts to 2027 – By COUNTRY(US$ Mn)
TABLE 6. France Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction
(US$ Mn)
TABLE 7. France Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type
(US$ Mn)
TABLE 8. France Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type
(US$ Mn)
TABLE 9. France Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 10. France Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals (US$ Mn)
TABLE 11. UK Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction (US$ Mn)
TABLE 12. UK Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type (US$ Mn)
TABLE 13. UK Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type (US$ Mn)
TABLE 14. UK Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 15. UK Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals (US$ Mn)
TABLE 16. Germany Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction
(US$ Mn)
TABLE 17. Germany Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type
(US$ Mn)
TABLE 18. Germany Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type (US$ Mn)
TABLE 19. Germany Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 20. Germany Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals
(US$ Mn)
TABLE 21. Netherlands Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction (US$ Mn)
TABLE 22. Netherlands Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type (US$ Mn)
TABLE 23. Netherlands Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type (US$ Mn)
TABLE 24. Netherlands Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 25. Netherlands Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals (US$ Mn)
TABLE 26. Ireland Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction
(US$ Mn)
TABLE 27. Ireland Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type
(US$ Mn)
TABLE 28. Ireland Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type
(US$ Mn)
TABLE 29. Ireland Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 30. Ireland Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals (US$ Mn)
TABLE 31. Denmark Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction
(US$ Mn)
TABLE 32. Denmark Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type (US$ Mn)
TABLE 33. Denmark Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type (US$ Mn)
TABLE 34. Denmark Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 35. Denmark Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals
(US$ Mn)
TABLE 36. Belgium Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction
(US$ Mn)
TABLE 37. Belgium Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type
(US$ Mn)
TABLE 38. Belgium Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type (US$ Mn)
TABLE 39. Belgium Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards (US$ Mn)
TABLE 40. Belgium Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals (US$ Mn)
TABLE 41. Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 – By Type of Construction (US$ Mn)
TABLE 42. Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 – By Electrical Design Type (US$ Mn)
TABLE 43. Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 – By Mechanical Design Type (US$ Mn)
TABLE 44. Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 – By Tier Standards
(US$ Mn)
TABLE 45. Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 – By Industry Verticals (US$ Mn)
TABLE 46. Glossary of terms, Data Center Construction market
list of figures
FIGURE 1. Europe Data Center Construction market segmentation
FIGURE 2. Data Center Construction market segmentation – BY Region
FIGURE 3. ireland Data Center Construction market, 2018-2027 (US$ Mn)
FIGURE 4. Europe Data Center Construction Market Breakdown By type of construction, 2018 & 2027 (%)
FIGURE 5. Europe – pest analysis
FIGURE 6. Europe Data Center Construction Market Impact Analysis of Driver and Restraints
FIGURE 7. Europe Data Center Construction Market Forecast and Analysis, (US$ Mn)
FIGURE 8. Europe Data Center Construction Market Breakdown By Type, 2018 & 2027 (%)
FIGURE 9. Europe Data Center Construction Market, By General Construction Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 10. Europe Data Center Construction Market, By electrical design Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 11. Europe Data Center Construction Market, By UPS Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 12. Europe Data Center Construction Market, By generators Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 13. Europe Data Center Construction Market, By PDU Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 14. Europe Data Center Construction Market, By Transfer Switchgear Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 15. Europe Data Center Construction Market, By others Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 16. Europe Data Center Construction Market, By mechanical design Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 17. Europe Data Center Construction Market, By HVAC Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 18. Europe Data Center Construction Market, By Other Cooling Equipment Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 19. Europe Data Center Construction Market, By TIER STANDARDS, 2018 & 2027 (%)
FIGURE 20. Europe Data Center Construction Market, By Tier 1 & Tier 2 Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 21. Europe Data Center Construction Market, By TIER 3 Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 22. Europe Data Center Construction Market, By TIER 4 Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 23. Europe Data Center Construction Market, By INDUSTRY VERTICAL, 2018 & 2027 (%)
FIGURE 24. Europe Data Center Construction Market, By BFSI Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 25. Europe Data Center Construction Market, By Government Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 26. Europe Data Center Construction Market, By Technology Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 27. Europe Data Center Construction Market, By telecom, media & entertainment Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 28. Europe Data Center Construction Market, By Retail Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 29. Europe Data Center Construction Market, By healthcare Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 30. europe Data Center Construction Market, By others Application Market Revenue and Forecasts to 2027 (US$ Mn)
FIGURE 31. Europe Data Center Construction Market Breakdown by Key Countries, 2018 & 2027(%)
FIGURE 32. France Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 33. UK Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 34. Germany Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 35. Netherlands Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 36. Ireland Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 37. Denmark Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 38. Belgium Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
FIGURE 39. Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
The List of Companies
- AECOM Inc
- ISG PLC
- Jacobs
- John Sisk & Son
- Jones Engoineering Group
- Mace Group
- Mercury Engineering
- Structuretone
- Skanska
- Arup
- Cap Ingelec
- Save and reduce time carrying out entry-level research by identifying the growth, size, leading players and segments in the Europe data center construction market.
- Highlights key business priorities in order to assist companies to realign their business strategies.
- The key findings and recommendations highlight crucial progressive industry trends in the Europe data center construction market, thereby allowing players across the value chain to develop effective long term strategies.
- Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
- Scrutinize in-depth global market trends and outlook coupled with the factors driving the market, as well as those hindering it.
- Enhance the decision-making process by understanding the strategies that underpin commercial interest with respect to client products, segmentation, pricing and distribution.